Jelena Vilus
Professor of Law, Novi Sad/Belgrade
Introductory remarks
I. Anticipatory breach and installment contracts
1. Suspension of performance
INTRODUCTORY REMARKS
The provisions common to the obligations of the seller and of the buyer are found in Articles 71-88 of the
Vienna Convention, which means that 17 articles are devoted to these obligations. This number shows that
it was considered to be in the interest of the parties to regulate their common obligations rather thoroughly.
In connection with these obligations the following questions will be analyzed:
Before analyzing the above questions, we should point out that these obligations cannot be completely understood without
taking into account certain standard notions of the Convention such as: [page 240]
Many of these standard notions are more familiar to the lawyer of the common law system than to the civil law
lawyer; nevertheless, they are basically the same and fairly well known to businessmen in the international sale of
goods.
I. ANTICIPATORY BREACH AND INSTALLMENT CONTRACTS
In regard to anticipatory breach of contract, the basic question is whether the party that doubts the performance of
the other party has the right to suspend or avoid the contract prior to the date for performance. In other words, if
the situation and the circumstances change during the performance of the contract and one of the parties is of the
opinion that the other will not be able to fulfill his obligations, the question arises whether this party should wait until
the other party becomes insolvent, for instance, or whether in such a case he himself should decide to suspend
performance of his obligations and demand additional guarantees. On the other hand, what would happen if his
evaluation of the other party's ability to perform is groundless and the other party subsequently suffers financial loss
as a result of the anticipatory breach? These dilemmas will have to be solved by arbitrators or judges deciding
disputes involving international contracts of sale and were the same problems which were discussed at the Vienna
Conference during preparation and adoption of the relevant provisions. [page 241]
It should be mentioned that there is a similar institution in the domestic law of civil law countries known as non
adimplety contractus (precontractual non-performance).
1. Suspension of Performance
As provided by Art. 71, one of the contracting parties may suspend his obligations if, after the conclusion of the
contract, it becomes evident that the other party will "not perform a substantial part of his obligations." However,
it is not sufficient that this is foreseeable on the basis of a subjective evaluation of one of the parties and may also
be the ground for an abuse. Instead, the Vienna Convention insists on two additional conditions: a serious deficiency
in his ability to perform or in his creditworthiness; or his conduct in preparing to perform or in performing the
contract.
Here it is perhaps of interest to mention that the Uniform Law on the International Sale of Goods (ULIS) refers in
Art. 73 to a difficult "economic situation of the other party," which was considered too narrow as a condition for
suspension of performance. Of course, it could be questioned whether the ULIS provision was, in fact, broader than
that of the Vienna Convention.
It should be emphasized that it indeed may prove difficult to determine what is to be regarded as "a serious
deficiency" in performance ability and what kind of conduct "in preparing or in the performing of a contract" will be
sufficient as a ground for the other party to suspend his obligations.[1] In order to protect the other party, the text
emphasizes that suspension of obligations is possible only if there are adequate grounds to conclude that the other
party [page 242] will not perform a substantial part of his obligation. It should be pointed out that if anticipatory
breach is performed without a good reason, then that party will be in breach of contract.
Needless to say, in many cases application of the provisions of this article may prove to be
difficult and may even lead to abuse since the provisions give rather broad power. A decision to
suspend performance may entirely depend on one party's subjective evaluation of the other's
ability to perform.
However, risks of this kind cannot be fully avoided in international trade. Nonetheless, it is not surprising that many
delegates at the Vienna Conference were in favor of deleting this article.
a) Preventing the handing over of the goods to the buyer
In case the seller has already dispatched the goods before the grounds for suspension become evident, he,
nevertheless, "may prevent the handing over of the goods to the buyer even though the buyer holds a document
which entitles him to obtain them," for instance, a Bill of Lading.
The most common situation referred to in Art. 71 is the case when the goods are in transit. In such circumstances
there is a common law institution called stoppage in transitu [2] which the seller can use when the buyer has delivered
the documents to a third person. This is clear from the formulation of Art. 71 which emphasizes that "the present
paragraph relates only to the rights in the goods as between the buyer and the seller." The view is held that in such
cases the seller cannot claim the goods from a third party [page 243] on the basis of the Convention, but he might
do so under the applicable national law.[3]
b) Sending notice
The party who suspends his performance under Art. 71 is obliged to send notice immediately "to the other party and
must continue with performance if the other party provides adequate assurance of his performance." This rule applies
irrespective whether the suspension occurs before or after the goods have been dispatched. It has been noted that
this provision is under the influence of bank guarantees - a practice that was used as widely before the Vienna
Convention and therefore was not provided for in the Hague Uniform Law. The question, however, remains open
as to whether or not a bank guarantees for reimbursement of payments under the contract will be considered an
"adequate assurance."
Suspension of the performance of the first party may last: a) until the other party performs his part of the obligations;
b) until the first party gets "adequate assurance;" c) until the other party announces that he intends to avoid the
contract; or d) until the expiration of the limitation period.
In case the party suspending performance suffers losses as a result of his not having received adequate assurance,
he has the right to claim compensation regardless whether or not the contract is avoided.
2. Anticipatory breach involving fundamental breach of contract
Art. 72 of the Vienna Convention provides for [page 244] special rules in cases where there is a fundamental breach
of contract.
Although Art. 72 is a logical continuation of the preceding article, its consequences are quite different. Whereas
under Art. 71 the contract continues to exist while only its performance has been suspended, the provisions of Art.
72 permit avoidance of the contract "if prior to the date for performance it is clear that one of the parties will commit
a fundamental breach of contract." It should, however, be pointed out that suspension of the contract under Art. 71
may lead to avoidance of the contract as well.
The party intending to declare the contract avoided must be absolutely sure that there is indeed a fundamental breach
of contract.
Since this provision is also found in ULIS,[4] it is relevant to cite A. Tunc who holds that such a provision is fully
justified since it would not be
"right that one party remains bound by the contract when the other has, for instance, deliberately declared that he
will not carry out one of his fundamental obligations or when he conducts himself in such a way that it is clear that
he will commit a fundamental breach of contract."[5]
There are, however, other views according to which such a right may be dangerous since, even if there is a breach, this does
not necessarily mean that the contract will not be fulfilled. It is not always easy to provide clear proof of a fundamental
breach of contract except in exceptional cases, for instance, bankruptcy of the debtor. In other words, there is the possibility
that abuse may arise, especially in cases where the creditor has the opportunity to conclude a [page 245] contract with other
partners under better conditions.[6]
Similar fears were expressed at the Vienna Conference by many delegates of developing countries who
insisted especially on the condition that the party intending to declare the contract avoided must inform the
other party of his intention so as "to permit him to provide adequate assurance of his performance." The
industrially developed countries were against this, pointing out that two things had been mixed up, i.e.,
suspension of performance and the right to avoid the contract.
In order to satisfy both demands, a compromise was reached. Accordingly, para. 2 of Art. 72 provides that "if time allows"
(compromise to the developed countries), "the party intending to declare the contract avoided must give reasonable notice
to the other party in order to permit him to provide adequate assurance of his performance" (compromise to the developing
countries).[7] An exception to this rule is provided for in para. 3 of Art. 72 in cases where it is absolutely clear or obvious that
the other party "will not perform his obligations."
3. Installment contracts
Art. 73 represents, in principle, application of the rule of Art. 72 in the special case of installment contracts.
The basic problem concerns whether installment contracts should be considered as one contract, i.e., in their
totality, whereby a difficulty of performance in regard to one installment would affect the contract as a whole,
thus avoiding the whole contract, or whether they should be regarded as a series of separate contracts. Since
abuses are possible in [page 246] cases involving installment contracts, the rights and duties of the parties
should be analyzed very carefully.
II. DAMAGES
In connection with damages, the Vienna Convention first specifies the damages for breach of contract (Art. 74), then deals
with the questions of purchase or resale of goods when the contract is avoided (Articles 75 and 76), and finally reminds the
party who relies on a breach of contract to "take such measures as are reasonable in the circumstances to mitigate the loss"
and states the consequence for parties failing to do so (Art. 77).
1. Calculation of damages: influence of common law notions
The rule of Art. 74 provides that
"damages for breach of contract by one party consist of a sum equal to the loss, including loss of profit, suffered by
the other party as a consequence of the breach."
However, the same article contains the exception to this rule, according to which
"such damages may not exceed the loss which the party in breach foresaw or ought to have foreseen at the time of
the conclusion of the contract, in the light of the facts and matters of which he then knew or ought to have known,
as a possible consequence of the breach of contract."
This notion of calculating damages has been taken from the common law system; the same idea [page 247] was also
incorporated into the Hague Uniform Law (Art. 82). In the common law system, the sum of the damages is not limited in
cases involving tort liability. However, in the field of contract liability the basic question concerns how remote the loss is
from the cause of the damage. This is the so-called remoteness of damages which is based on the well-known British case
of Hadley v. Baxendale (1854). It, in fact, means that the party liable for loss will be liable only for the loss which he
"foresaw or ought to have foreseen" at the time of the conclusion of the contract. In his commentary of ULIS, Tunc points
out that such a concept is found in many legal systems. Furthermore, he states:
"If one of the parties considers, at the time of the negotiations preliminary to the contract, that breach on the part
of the other party would cause him exceptionally heavy loss, he may always make this known to the other party."[8]
Calculating damages in the way provided by Art. 74 may be regarded as just. Namely, limiting the damages to the foreseeable
loss purports, inter alia, to protect the debtor from unjustifiable claims on the part of the creditor. The purpose of this article
is to place the party suffering the loss in the same economic position he would have been in had the contract been performed.
The special rules concerning loss of profit were necessary because in certain legal systems loss (perte) does not include loss
of profit (gain manqé).
It may be observed that the criterion according to which it is judged whether or not the party is liable is both subjective
("foresaw") and objective ("ought to have foreseen"). In spite of the fact that the Vienna Convention [page 248] has
introduced a fairly good rule on the calculation of damages, this is nevertheless a delicate question. In view of the fact that
the relevant circumstances vary from case to case, arbitrators and judges will have problems determining an amount of
damages that is just in certain cases.
2. Damages involving avoidance of contract
The rule adopted in most legal systems, and the Vienna Convention as well, is that, in addition to avoidance, the party
aggrieved by the breach may always claim damages to compensate for the loss caused by avoidance.
Art. 75 of the Vienna Convention follows:
"If the contract is avoided and if, in a reasonable manner and within a reasonable time after avoidance, the buyer has
bought goods in replacement or the seller has resold the goods, the party claiming damages may recover the
difference between the contract price and the price in the substitute transaction as well as any further damages
recoverable under article 74."
According to Tunc, this rule "could not be otherwise."[9] The condition provided for in Art 75 is that the replacement purchase
or the resale must be made "in a reasonable manner and within reasonable time" after avoidance. Here the term "reasonable
manner" is to be interpreted as the duty of the buyer to buy the goods at the lowest possible price and of the seller to sell
them at the highest possible price. The "reasonable time" starts to run at the time when the aggrieve party avoided the
contract. [page 249]
The relevant provisions of Art. 76 should be taken into account when calculating differences in price,[10] and the relevant
provisions of Art. 74 when calculating additional compensation.[11]
There are occasions when the buyer or seller does not make a replacement purchase or resale, respectively,
but instead, due to a breach of contract, prefers to avoid the contract. In such cases the question arises as to
how compensation should be calculated. This situation is known in all legal systems; in the civil law countries
the so-called abstract damages are calculated, as opposed to concrete damages which occur when a purchase
in replacement or resale took place and are thus easier to calculate.
If there was no purchase in replacement or resale under Art. 75, Art. 76 provides that the party claiming damages may ...
"recover the difference between the price fixed by the contract and the current price at the time of avoidance as well
as any further damages recoverable under article 74."
In the same article "current price" is defined as ...
"the price prevailing at the place where delivery of the goods should have been made or, if there is no current price
at that place, the price at such other place as serves as a reasonable substitute, making the allowance for differences
in the cost of transporting the goods."
There are several points which should be mentioned in connection with Art. 76. First, the time of avoidance of contract may
in practice be difficult to ascertain and could therefore lead to abuse. For instance, the party who plans to [page 250] avoid
the contract may speculate by waiting to avoid the contract at a time which, financially speaking, is more favorable for him.
In order to keep possible abuses to a minimum, Art. 76 provides that in cases where the party claiming damages has avoided
the contract "after taking the goods," the "current price of such taking over shall be applied instead of the current price at
the time of avoidance."
In regard to the place where the current price is to be determined, Art. 76 refers to: a) "the place where delivery of the goods
should have been made," or alternatively b) "if there is no current price at that place," then "such other place as serves as
a reasonable substitute." It should also be mentioned that Art. 76 reminds the contracting parties that "the allowance for
differences in the cost of transporting the goods" should be added.
3. Duty to cooperate in case of breach
Art. 77 of the Vienna Convention contains the rule according to which
"a party who relies on a breach of contract must take such measures as are reasonable in the circumstances to
mitigate the loss, including the loss of profit, resulting from the breach."
According to Tunc, this rule, which is the same as that in Art. 88 of ULIS, is found in numerous codes of European countries
and is often propounded by the courts of common law countries. Thus Tunc concludes, "Its reasonableness is evident."[13]
Furthermore, the same article provides that if the party who is obliged to take the necessary measures to mitigate the loss
fails to do so, then "the party in breach may claim a [page 251] reduction in damages in the amount by which the loss should
have been mitigated." It is obvious that this is a very serious obligation on the part of the "creditor," the party who relies on
breach, i.e., the innocent party, since the sanction consists of a "reduction of damages."
Indeed, the creditor should attempt to undertake everything possible in order to diminish the loss or at least to prevent its
increase, and thus this rule may be regarded as just and fair.
III. INTEREST
The provisions on interest were the subject of great controversy and differences of opinion both in ULIS and at the Vienna
Convention. On the one hand, there were those who wanted to delete these provisions altogether, whereas, on the other
hand, others favored detailed provisions regulating the legal consequences in cases where the buyer fails to fulfill his major
obligation, i.e., to pay the price.
Art. 78 reads as follows:
"If a party fails to pay the price or any other sum that is in arrears, the other party is entitled to interest on it without
prejudice to any claim for damages recoverable under article 74."
This article differs to a great extent from the provision in ULIS on interest.[14]
At the Vienna Conference, the developing countries were very concerned about the article governing
calculation of the interest rate. An increase of the interest rate by 1%, as was suggested by some countries,
was considered by the developing countries to be extremely high, although it was suggested, for instance,
by the International Chamber of Commerce, that the interest [page 252] rate should be increased by 2%.
Furthermore, it was proposed that the interest rate should be similar or identical to the prevailing rate at the
main financial center of the debtor or the capital of the debtor's country. However, it was argued that in
certain countries, the main financial center and the capital are not the same place, for instance, in the USA,
in Switzerland and other countries. Moreover, the Muslim countries argued that provisions on interest would
be contrary to Islamic law which forbids arrangements on interest. Consequently, it was difficult to agree on
a solution that would satisfy the majority.
While the provisions of Art. 78 do not mean much to many, on the other hand, others consider them to be useful since they
enable the creditor to claim not only interest but also compensation under Art. 74, which is not possible in some countries.
The question of interest is important in view of Art. 84(1) which provides that "if the seller is bound to return the price, he
must also pay the interest on it from the date on which the price was paid." This is the universally accepted practice, in the
Muslim countries as well, and therefore it is indeed difficult to understand why the efforts to regulate this question met with
such opposition.
IV. EXEMPTIONS
The question of exemptions which is regulated by Art. 79 of the Vienna Convention is extremely important --
both from a practical and a theoretical point of view. In certain cases, one of the parties may be confronted
by such a change in circumstances that he is either unable to continue [page 253] his obligations or, if he
does, they will become an extremely heavy burden to him. All countries have special rules governing such
situations, and therefore it was only natural to incorporate provisions on exemption into the Vienna
Convention, as was also the case in ULIS. However, in this field, as in many others, the notions of common
law and civil law differ. As a result, the international drafters wanted to create a new concept by
amalgamating different ideas, which, of course, has its positive and negative aspects.
According to the provisions of Art. 79 of the Convention, a party is released from liability[15] when his failure to perform is
due to an impediment beyond his control if: a) he could not reasonably be expected to have taken the impediment into
account; b) the impediment could not have been avoided; and c) the party was not able to overcome it.
1. General rule on exemptions
It should be pointed out that at the very outset many problems arose in connection with the drafting of the rule on
exemptions. Whereas ULIS (Art. 74) refers to circumstances, the Vienna Convention speaks of an impediment. Tunc
maintains that the sole purpose of such provisions is to "provide an answer to the question whether [the] party" that has
failed to perform his obligation "should or should not be liable for damages."[16]
During the debate it was pointed out in the working group at the annual sessions of the Commission and
at the Vienna Conference that the main problem arose from the fact that the article attempts to combine
the concepts of vis major [page 254] (force majeure, act of God) and frustration (imprévision).
Both ULIS and the Vienna Convention took "the middle road" by connecting the subjective and objective
circumstances, which did, and probably will lead to controversy and differences of opinion. Many thought
that this combination was very unfortunate since it causes confusion by trying to combine different things.
Vis major should exempt the party from paying damages, whereas frustration releases him entirely from
his obligations.
It was probably due to these different viewpoints that the drafting group and the Vienna Conference
adopted the provision contained in para. 5 of Art. 79 according to which nothing in this article prevents
either party from exercising any right other than to claim damages under this Convention.
2. Other grounds for exemptions
Situations in which the party's failure to perform any of his obligations is due to the failure by a third person whom he had
engaged to perform the whole or part of the contract are governed by Art. 79 of the Vienna Convention. In such cases, the
party may be exempted from liability under the conditions set forth in para. 2 of Art. 79.
3. Temporary impediment
According to para. 3 of Art. 79, the exemption has effect only "for the period during which the impediment exists."
Therefore, the exemption from liability ceases to exist either on the date for [page 255] performance or the date on which
the impediment was removed.
In case the impediment amounts to a fundamental breach of contract, the innocent party has the right to avoid the contract.
4. Duty to send notice
The party exempted from liability to pay damages under Art. 79 "must give notice to the other party of the impediment and
its effect on his ability to perform." The risk is borne by the sender in case the "notice is not received by the other party within
a reasonable time after the party who fails to perform knew or ought to have known of the impediment."[17]This party will
be liable for damages resulting "from such non-receipt."
5. Self-made failure
The provision of Art. 80 of the Vienna Convention reads as follows:
"A party may not rely on a failure of the other party to perform, to the extent that such failure was caused by the first party's act or omission." It was suggested that this provision should be included with those dealing with good faith, in which case its sphere of
application would have been broader. Nevertheless, the view prevailed that it is more closely related to exemptions and duty
to cooperate in cases of impediments.
V. EFFECTS OF AVOIDANCE
The Vienna Convention contains four articles on the effects of avoidance. The general rule is [page 256] found in Art. 81,
while Articles 82, 83, and 84 specify the concrete duties of the seller and buyer in cases of avoidance of contract.
1. General rule
According to Art. 81, "avoidance of the contract releases both parties from their obligations under it, subject to any damages
which may be due." This means that "the seller need not deliver the goods and the buyer need not take delivery and pay for
them."[18] The main consequence is that both parties are free in the sense that they are released from the duties and obligations
assumed under the contract, except the obligation to pay damages.
In some legal systems, avoidance of the contract eliminates all rights and obligations under the contract. In view of this, Art.
81 expressly states:
"Avoidance does not affect any provision of the contract for the settlement of disputes or any other provisions of
the contract governing the rights and obligations of the parties consequent upon the avoidance of the contract."
The purpose of these provisions is to prevent complete termination of the contract, including those provisions dealing, e.g.,
with penalty clauses (liquidated damages), applicable law, arbitration and similar provisions, all of which will help the party
relying on the avoidance take recourse to remedies provided by the Convention and the applicable law. On the other hand,
the Vienna Convention does not say that these provisions are valid;[19] it merely provides the rule according to which
avoidance of the contract "does not effect such provisions." [page 257]
It should be pointed out that there is no similar provision in ULIS.[20]This was considered "unfortunate" since in the absence
of such a provision, it might appear that a choice of law clause, a choice of forum clause, an arbitration clause or a liquidated
damages clause would be ineffective once the contract is avoided.[21]
If one of the parties has performed the contract, entirely or in part, this party "may claim restitution from the
other party of whatever the first party has supplied or paid under the contract." In some cases restitution will
not be possible, for instance, restitution of the received goods. This, however, could not occur with respect
to the seller's duty to refund the received price. In such exceptional cases the provisions of Art. 82 of the
Convention shall apply.
2. Special rules on effects of avoidance
Para. 1 of Art. 82 provides that the buyer loses his right to declare the contract avoided if he is unable to return the goods
in substantially the same condition in which he received them. This rule simply recognizes the effect of natural causes on the
condition of the delivered goods. On the other hand, the goods to be returned do not have to be the same goods that were
received; rather they must be "substantially in same the condition in which" the goods were received.[22]
The rule in para. 1 of Art. 82 shall not apply in the following cases: a) if the impossibility of the buyer to
return the goods "substantially in the condition in which he received them ... is not due to his act or
omission;" b) if the goods have perished or deteriorated, in whole or in part, ''as a result of the examination
provided [page 258] for in article 38;" and c) if the goods, or part of them, have been sold in the normal
course of business or have been consumed, or transformed by the buyer in the course of normal use "before
he discovered or ought to have discovered the lack of conformity."
The Commentary prepared by UNCITRAL points out that the right of either party to require restitution may be thwarted
by other rules which fall outside the scope of the international sale of goods. In this context it is stressed:
"If either party is in bankruptcy or other insolvency procedures, it is possible that the claim of restitution will not be
recognized as creating a right in the property or as giving a priority in the distribution of the assets. Exchange control
laws or other restrictions on the transfer of goods or funds may prevent the transfer of goods or money to the
demanding party in a foreign country."[23]
According to the Commentary, these and other similar legal rules may reduce the value of the claim of restitution, but they
do not affect the validity of the rights between the parties.
If the buyer loses his right to avoid the contract or to request replacement of the goods, he nevertheless, "retains all other
remedies under the contract and this Convention." As provided by Art. 83 of the Convention, this means that the buyer has
retained the right to damages (Art. 45), to repair of the goods (Art. 46), or to reduction of price (Art. 50).
A rule that is known in many legal systems and has also been accepted by the Vienna Convention obliges
the party who must return the goods or refund the price to also account for any benefit [page 259] which
he has received by virtue of having had possession of the money or the goods. Under Art. 84, if the seller
is obliged to refund the price, "he must also pay interest on it from the date on which the price was
paid."[24] This obligation is rather "simple" and almost automatic, regardless of the fact that the Vienna
Convention, as was pointed out earlier, does not provide for a rule to determine the amount of interest.
On the other hand, when the buyer benefited from the goods, he is obliged by para. 2 of Art. 84 to
"account to the seller for all benefits which he has derived from the goods or part of them." This
obligation on the part of the buyer would apply in the following cases: a) if he must make restitution of
the goods or part of them, and b) if it is impossible for him to make restitution of all or part of the goods
or to make restitution of all or part of the goods substantially in the condition in which he received them,
"but he has nevertheless declared the contract avoided or required the seller to deliver substitute goods."
VI. PRESERVATION OF THE GOODS
Preservation of the goods is regulated in Articles 85-88 of Section VI which contains rules guaranteeing the rights of the
buyer. Irrespective of which party bears the risk for loss or damage, the basic rule obliges the person who has possession
or control of the goods to "take such steps as are reasonable in the circumstances to preserve them." Accordingly, Art. 85
of the Convention obliges the seller to take such steps ''as are reasonable in the circumstances" to preserve the goods. In such
a case, the risk will normally have passed to the buyer; thus, the [page 260] significance of this rule is that it releases the
buyer from liability for loss resulting from the seller's failure to preserve the goods.[25] The seller, however, is entitled "to retain
[the goods] until he has been reimbursed his reasonable expenses by the buyer."
In connection with the provisions of Art. 85, it should be pointed out that reasonable circumstances and
reasonable expenses are common law notions which provide standards according to which a judge or
arbitrator can evaluate the necessary steps and expenses.
Art. 86 deals with the problem of preserving the goods in the opposite case, i.e., when the goods have been received by the
buyer and he intends to reject them. In such a case, he has the same obligations as the seller under Art. 85.
If the goods have been dispatched to the buyer but the buyer, intending to reject them, has not taken possession of them,
para. 2 of Art. 86 provides:
"... he must take possession of them on behalf of the seller provided that this may be done without payment of the
price and without unreasonable inconvenience or unreasonable expense."
Here, as in the preceding article, we have the common law notions of "inconvenience" and expenses which are considered
to be "unreasonable." Since this rule is taken from ULIS, we refer to Tunc who points out that in the given circumstances
it must be assumed that the buyer will "ordinarily be better placed than the seller to take care" of the goods.[26] The buyer is
released from this obligation "if the seller or a person authorized to take charge of the goods on his behalf is present at the
destination."
The rule of Art. 87 of the Convention, which [page 261] can be found in many national laws and in ULIS Art. 93) as well, reads as follows:
"A party who is bound to take steps to preserve the goods may deposit them in a warehouse of a third person at the
expense of the other party provided that the expense incurred is not unreasonable."
If the goods are subject to rapid deterioration or the party who is bound to preserve them in accordance with Art. 85 or 86
would incur unreasonable expense in doing so, this party is entitled to sell them. The same rule applies "if there has been an
unreasonable delay by the other party in taking possession of the goods or in taking them back or in paying the price or cost
of preservation." In all of these circumstances, "a reasonable notice" of the intention to sell must be given to the other party.
After selling the goods, the party exercising this right under the Convention may retain out of the proceeds of sale "an
amount equal to the reasonable expenses of preserving the goods and of selling them." In this case, he is bound to account
to the other party for the balance. In connection with para. 3 of Art. 88, it is pointed out in the Commentary that if the party
selling the goods has other claims arising out of the contract or its breach, under the applicable national law he may have
the right to defer the transmission of the balance until the settlement of those claims.[27]
FOOTNOTES
1. In the Commentary to the Draft Convention Prepared by UNCITRAL, it is mentioned that this may be the case when the
buyer fell behind in his payments to the seller in respect of other contracts. (A)CONF.97(5), p. 159.
2. According to the American Uniform Commercial Code (§ 2-705), "the seller may stop delivery of
goods in the possession of a carrier or other bailee when he discovers the buyer to be insolvent ..."
3. T.C. Hartley, The Uniform Law on the International Sale of Goods... and the Draft Convention on Contracts for the International Sale of Goods prepared by UNCITRAL, vol. II (London 1979) p. 7/3.
4. Only para.1 of Art. 72 of the Vienna Convention has been taken from ULIS (Art. 76), which provides:
"Where prior to the date fixed for performance of the contract it is clear that one of the parties will commit a fundamental breach of contract, the other party shall have the right to declare the contract avoided."
5. A. Tunc, Commentary of the Hague Convention (The Hague 1966) p. 88.
6. Ph. Kahn, Etude comparée des Conventions de la Haye et Projet de Convention preparé par CNUDCI (Bruxelles 1979) p. 69.
7. The notion "reasonable notice" is not clear and may be interpreted in various ways. In the French version of the same
article we find the term dans les conditions raisonable, which sounds better although similar doubts may arise as well.
8. A. Tunc, supra n. 5, at p. 92.
9. Ibid. p. 94.
10. At the Vienna Conference, it was disputed whether the "contract price" and the "price fixed by the contract" are the
same. Many were of the opinion that the contract price is provided objectively and precisely by the contract, which is not
necessarily the case with the price fixed by the contract.
11. The additional expenses may include, e.g., the cost for transportation or for delay in delivery of the goods bought in
replacement by the buyer.
12. It should be pointed out that Art. 76 speaks of the price fixed by the contract, whereas Art. 75 refers to the contract
price.
13. A. Tunc, supra, n. 5, at p. 96.
14. Art. 83 of ULIS reads as follows:
"Where the breach of contract consists of delay in the payment of the price, the seller shall in any
event be entitled to interest on such sum as is in arrear at a rate equal to the official discount rate
in the country where he has his place of business or, if he has no place of business, his habitual
residence, plus 1%."
15. B. Nicholas, "Force Majeure and Frustration," Am.J.Comp.L. (1979) p. 232. The author explains that the English term
"exemption" could be explained by force majeure, cause éstrangère, "impossibility," "frustration," Wegfall der
Geschäftsqrundlaqe.
16. The main problem was whether to provide a detailed rule, in which case the text might be difficult to
understand, or to have a short rule, in which case there would be room for application of the national law,
which, however, was also not regarded as a satisfactory solution.
17. This rule is the exception to the rule found in Art. 27 of the Convention.
18. Commentary, supra n. 1, p. 175.
19. In Art. 4, the Convention expressly provides that it does not deal with "the validity of the contract or
of any of its provisions or of any usage."
20. The only effect of the avoidance according to para.1 of Art. 78 of ULIS amounts to release of both parties "from their
obligations thereunder, subject to any damages which may be due."
21. In some legal systems, after avoidance of the contract all these clauses terminate with the rest of the contract. Therefore,
the provision in the Vienna Convention provides a mechanism to avoid such results.
22. In the French text of the Convention the term sensiblement identique (almost identical) is used as the equivalent of
"substantially." Although there is no definition of the term "substantially," it is held that it should be interpreted as a condition
which the seller is not supposed to refuse to take.
23. Commentary, supra n. 1, at pp. 176-177.
24. Art. 78 provides:
"If the party fails to pay the price or any other sum that is in arrears, the other party is entitled to
interest on it, without prejudice to any claim for damages recoverable under article 74."
25. T.C. Hartley, supra n. 3, at p. 7/21.
26. A. Tunc, Commentary, supra n. 5, at p. 98.
27. Commentary, supra n. 1, at p. 197.
-
Anticipatory breach and installment contracts;
-
Damages;
-
Interest;
-
Exemptions;
-
Effects of avoidance of contract; and
-
Preservation of the goods.
-
Fundamental breach of contract (Art. 25);
-
Reasonability in regard to persons (Art. 25), time (Articles 73,75,79), notice (Articles 72, 88), circumstances (Art. 86);
-
Specific performance (Art. [28]); and
-
Duty to cooperate (Art. 77).